Repository
- WAPB Fish Tissue Sampling Results.pdf - 10/04/2023 - Author: WAPB 
- IDEM VFC 46504083 Firestone Completion Report.pdf - 09/22/2023 - Author: Arcadis 
- Floodway Habitat Mitigation Plan 2023.pdf - 08/28/2023 - Author: CEC 
- ED Project Clarifications - August 2023.pdf - 08/14/2023 - Author: CEC 
- ED R4-6 IM Work Plan (2 of 2).pdf - 02/01/2023 - Elliott Ditch Reach 4-6 Interim Measures Work Plan (2 of 2) - Author: CEC 
- ED R4-6 IM Work Plan (1 of 2).pdf - 02/01/2023 - Elliott Ditch Reach 4-6 Interim Measures Work Plan (1 of 2) - Author: CEC 
- ED R3 Post Construction Report .pdf - 01/13/2023 - Author: CEC 
- 2022 Floodway Habitat Mitigation Plan Report.pdf - 12/31/2022 - Floodway Habitat Mitigation Plan 2022 Annual Report for FW-29895 & FW-30899 - Author: CEC 
- ED R4-R6 Geomorphic Assessment Report .pdf - 11/29/2022 - Author: CEC 
- ED R1-3 Project Closeout Report (3 of 3).pdf - 01/31/2022 - ED R1-3 Project Closeout Report - Author: CEC 
- ED R1-3 Project Closeout Report (2 of 3).pdf - 01/31/2022 - ED R1-3 Project Closeout Report - Author: CEC 
- ED R1-3 Project Closeout Report (1 of 3).pdf - 01/31/2022 - ED R1-3 Project Closeout Report - Author: CEC 
- ED Sediment IDEM IMWP Approval.pdf - 06/10/2021 - IDEM approval for the ED Sediment Interim Measures Work Plan. - Author: IDEM 
- ED Sediment EPA IMWP Approval.pdf - 05/26/2021 - EPA - Region 5 approval for the ED Sediment Interim Measures Work Plan. - Author: EPA - Region 5 
- ED Sediment IDNR Construction in a Floodway.pdf - 05/21/2021 - IDNR certificate of approval for construction in a floodway for Elliott Ditch Reaches 1-3 Remediation. - Author: IDNR 
- ED Sediment SWPPP & Approvals.pdf - 04/15/2021 - Elliott Ditch Reach 1-3 Stormwater Pollution Prevention Plan (SWPPP) & regulatory approvals. - Author: CEC 
- ED Sediment IDEM Temporary Discharge Permit.pdf - 04/09/2021 - IDEM NPDES Temporary Discharge Permit Coverage for Elliott Ditch Reach 1-3. - Author: IDEM 
- REVISION 2 - ED Sediment IM Work Plan (2 of 2).pdf - 03/05/2021 - REVISION 2 - ED Sediment IM Work Plan (2 of 2) - Author: CEC 
- REVISION 2 - ED Sediment IM Work Plan (1 of 2).pdf - 03/05/2021 - REVISION 2 - ED Sediment IM Work Plan (1 of 2). - Author: CEC 
- ED Sediment IDEM 401 Approval & Modification.pdf - 03/03/2021 - IDEM Section 401 Water Quality Certification Approval & Modification for Elliott Ditch Reach 1-3. - Author: CEC 
- ED Floodway Mitigation Plan - REVISION 1.pdf - 01/21/2021 - Flood Mitigation Plan for Elliott Ditch Phase 1 & 2 projects. Revised January 2021. - Author: CEC 
- ED Levee Project Closeout Report (3 of 3).pdf - 01/05/2021 - ED Levee Project Closeout Report - Author: CEC 
- ED Levee Project Closeout Report (2 of 3).pdf - 01/05/2021 - ED Levee Project Closeout Report - Author: CEC 
- ED Levee Project Closeout Report (1 of 3).pdf - 01/05/2021 - ED Levee Project Closeout Report - Author: CEC 
- REVISION 1 - ED Sediment IM Work Plan (2 of 2).pdf - 12/07/2020 - Revision 1 of the Sediment IMWP - Author: CEC 
- REVISION 1 - ED Sediment IM Work Plan (1 of 2).pdf - 12/07/2020 - Revision 1 of the Sediment IMWP - Author: CEC 
- ED Sediment USACE NW 38 .pdf - 07/09/2020 - U.S. Army Corps of Engineers approval of NW 38 permit for Elliott Ditch Reach 1-3. - Author: USACE 
- DRAFT ED Sediment IM Work Plan (2 of 2).pdf - 06/22/2020 - Author: CEC 
- DRAFT ED Sediment IM Work Plan (1 of 2).pdf - 06/22/2020 - Author: CEC 
- EPA Levee Soil IM Work Plan Approval.pdf - 03/24/2020 - EPA - Region 5 approval for the Levee Soil Interim Measures Work Plan. - Author: EPA - Region 5 
- Lafayette J&C NOI Publication Notice.pdf - 02/26/2020 - Public notice in the Lafayette Journal & Courier for the submittal of the Stormwater Permit Notice of Intent (NOI). - Author: Lafayette Journal & Courier 
- City SWPPP Approval.pdf - 02/20/2020 - City of Lafayette approval of the Levee SWPPP. - Author: City of Lafayette 
- ED Levee Remediation Drawings.pdf - 02/19/2020 - Updated drawings for the Elliott Ditch Levee remediation. - Author: CEC 
- ED Levee SWPPP & Drawings.pdf - 01/30/2020 - Elliott Ditch Stormwater Pollution Prevention Plan (SWPPP) and drawings. - Author: CEC 
- IDEM Levee Soil IM Work Plan Approval.pdf - 01/07/2020 - IDEM approval for the Levee Soil Interim Measures Work Plan. - Author: IDEM 
- IDNR Construction in a Floodway Approval.pdf - 12/16/2019 - IDNR certificate of approval for construction in a floodway for Elliott Ditch Levee Remediation. - Author: IDNR 
- ED Updated Levee Soil IM Work Plan.pdf - 11/13/2019 - Updated levee soil interim measures work plan submitted for regulatory review and approval in November 2019. - Author: CEC 
- ED Floodway Mitigation Plan.pdf - 10/15/2019 - Flood mitigation plan for Elliott Ditch remediation projects submitted for regulatory review and approval in October 2019. - Author: CEC 
- ED Field Sampling Report.pdf - 08/01/2018 - Elliott Ditch reaches 1 thru 3 field sampling report. - Author: CEC 
- ED Field Sampling Plan.pdf - 02/02/2016 - Field sampling plan prepared to understand the distribution of potential PCB impacts in Elliott Ditch. - Author: Tetra Tech 
- ED Geomorphology Report.pdf - 07/06/2015 - Elliott Ditch geomorphic surface mapping and historic data review report. - Author: Tetra Tech